Over the past twenty years, the Government has sought to cultivate the biopharmaceutical industry as one of the future major industry in Taiwan. Back in 1982, the Government has begun to regard biotechnology as a key technology in Technology Development Program, demonstrated that biotechnology is a vital technology in pursuit of future economic growth. Subsequently, the Government initiated national programs that incorporated biotechnology as a blueprint for future industrial development. In order to enhance our competitiveness and building an initial framework for the industry, The Executive Yuan has passed the Biotechnology Industry Promotion Plan. As the Government seeks to create future engines of growth by building an environment conducive for enterprise development, the Plan has been amended four times, and implemented measures focused on the following six areas: related law and regulations, R&D and applications, technology transfer and commercialization, personnel training, investment promotion and coordination, marketing information and marketing service.
In 2002, the Executive Yuan approved the Challenge 2008, a six-year national development plan, pointing out biotechnology industry as one of the Two Trillion, Twin Stars industries. The Government planned for future economic growth by benefiting through the attributes of the biotechnology: high-tech, high-reward and less pollution. Thus, since 1997 the Strategic Review Board (SRB) under the Executive Yuan Science and Technology Advisory Panel has taken action in coordinating government policies with industry comments to form a sound policy for the biotechnology industry.
Additionally, a well-established legal system for sufficient protection of intellectual property rights is the perquisite for building the industry, as the Government recognized the significance through amending and executing related laws and regulations. By stipulating data exclusivity and experimental use exception in the Pharmaceutical Affair Act, tax benefits provided in Statute for Upgrading Industries , Incentives for Production and R&D of Rare Disease Medicine, Incentives for Medical Technology Research and Development, provide funding measures in the Guidance of Reviewing Programs for Promoting Biotechnology Investment.
Clearly, the government has great expectation for the industry through establishing a favorable environment by carrying out these policies and revising outdated regulations. Thus, the Legislative Yuan has passed the “Act for The Development of Biotechnology and New Pharmaceuticals Industry” in June, 2007, and immediately took effect in July. The relevant laws and regulations became effective as well, driving the industry in conducting researches on new drugs and manufacturing new products, increasing sales and expanding the industry to meet an international level.
For a biopharmaceutical industry that requires long-term investment and costly R&D, incentive measures is vital to the industry’s survival before the product launches the market. Accordingly, this article will be introducing the recent important regulation that supports the biopharmaceutical industry in Taiwan, and analyzing the government’s policies.
Biotechnology is increasingly gaining global attention for its potential in building future economic growth and generating significant profits. In an effort to support the biotechnology industry in Taiwan, the Government has made a step forward by enacting the “Act for the Development of Biotech and New Pharmaceutical Industry”.
The biopharmaceutical industry is characterized as high-risk and high-reward, strong government support and a well-developed legal system plays a vital role from its establishment throughout the long term development. Therefore, the Act was enacted tailor to the Biotech and New Pharmaceutical Industry, primarily focuses on tax benefits, R&D activities, personnel recruitment and investment funding, in support of start-up companies and attracting a strong flow of funding worldwide.
To pave the way for promoting the biopharmaceutical industry and the Biotech and New Pharmaceutical Company, here the article will be introducing the incentive measures provided in the Act, and supporting development of the industry, demonstrating the efforts made by the Government to build a “Bio-tech Island”.
“Act for Development of Biotech and New Pharmaceutical Industry”, webpage of Law and Regulations Database of the Republic of China. 4 July, 2007. Ministry of Justice, Taiwan. 5 Nov. 2008 http://law.moj.gov.tw/Eng/Fnews/FnewsContent.asp?msgid=3180&msgType=en&keyword=undefined
Experiences about opening data in private sector Ⅰ. Introduction Open data is the idea that data should be available freely for everyone to use and republish without restrictions from copyright, patents or other mechanisms of control. The concept of open data is not new; but a formalized definition is relatively new, and The Open Definition gives full details on the requirements for open data and content as follows: Availability and access: the data must be available as a whole with no more than a reasonable reproduction cost, preferably by downloading over the internet. The data must also be available in a convenient and modifiable form. Reuse and redistribution: the data must be provided under terms that permit reuse and redistribution including the intermixing with other datasets. The data shall be machine-readable. Universal participation: everyone must be able to use, reuse and redistribute the data— which by means there should be no discrimination against fields of endeavor or against persons or groups. For example, “non-commercial” restrictions that would prevent “commercial” use, or restrictions of use for certain purposes are not allowed. In order to be in tune with international developmental trends, Taiwan passed an executive resolution in favor of promoting Open Government Data in November 2012. Through the release of government data, open data has grown significantly in Taiwan and Taiwan has come out on top among 122 countries and areas in the 2015 and 2016 Global Open Data Index[1]. The result represented a major leap for Taiwan, however, progress is still to be made as most of the data are from the Government, and data from other territories, especially from private sector can rarely be seen. It is a pity that data from private sector has not being properly utilized and true value of such data still need to be revealed. The following research will place emphasis to enhance the value of private data and the strategies of boosting private sector to open their own data. Ⅱ. Why open private data With the trend of Open Government Data recent years, countries are now starting to realize that Open Government Data is improving transparency, creating opportunities for social and commercial innovation, and opening the door to better engagement with citizens. But open data is not limited to Open Government Data. In fact, the private sector not only interacts with government data, but also produces a massive amount of data, much of which in need of utilized. According to the G20 open data policy agenda made in 2014, the potential economic value of open data for Australia is up to AUD 64 billion per annum, and the potential value of open data from private sector is around AUD 34 billion per annum. Figure 1 Value of open data for Australia (AUD billion per annum) Source: McKinsey Global Institute The purpose for opening data held by private entities and corporations is rooted in a broad recognition that private data has the potential to foster much public good. Openness of data for companies can translate into more efficient internal governance frameworks, enhanced feedback from workers and employees, improved traceability of supply chains, accountability to end consumers, and with better service and product delivery. Open Private Data is thus a true win-win for all with benefiting not only the governance but environmental and social gains. At the same time, a variety of constraints, notably privacy and security, but also proprietary interests and data protectionism on the part of some companies—hold back this potential. Ⅲ. The cases of Open Private Data Syngenta AG, a global Swiss agribusiness that produces agrochemicals and seeds, has established a solid foundation for reporting on progress that relies on independent data collection and validation, assurance by 3rd party assurance providers, and endorsement from its implementing partners. Through the website, Syngenta AG has shared their datasets for agricultural with efficiency indicators for 3600 farms for selected agro-ecological zones and market segments in 42 countries in Europe, Africa, Latin America, North America and Asia. Such datasets are precious but Syngenta AG share them for free only with a Non-Commercial license which means users may copy and redistribute the material in any medium or format freely but may not use the material for commercial purposes. Figure 2 Description and License for Open data of Syngenta AG Source: http://www.syngenta.com Tokyo Metro is a rapid transit system in Tokyo, Japan has released information such as train location and delay times for all lines as open data. The company held an Open Data Utilization Competition from 12 September to 17 November, 2014 to promote development of an app using this data and continues to provide the data even after the competition ended. However, many restrictions such as non-commercial use, or app can only be used for Tokyo Metro lines has weakened the efficiency of open data, it is still valued as an initial step of open private data. Figure 3 DM of Tokyo Metro Open data Contest Source: https://developer.tokyometroapp.jp/ Ⅳ. How to enhance Open Private Data Open Private Data is totally different from Open Government Data since “motivation” is vital for private institutions to release their own data. Unlike the government data can be disclosed and free to use via administrative order or legislation, all of the data controlled by private institutions can only be opened under their own will. The initiative for open data therefore shall focus on how to motivate private sectors releasing their own data-by ensuring profit and minimizing risks. Originally, open data shall be available freely for everyone to use without any restrictions, and data owners may profit indirectly as users utilizing their data creating apps, etc. but not profit from open data itself. The income is unsteady and data owners therefore lose their interest to open data. As a countermeasure, it is suggested to make data chargeable though this may contradict to the definition of open data. When data owners can charge by usage or by time, the motivation of open data would arise when open data is directly profitable. Data owners may also worry about many legal issues when releasing their own data. They may not care about whether profitable or not but afraid of being involved into litigation disputes such as intellectual property infringement, unfair competition, etc. It is very important for data owners to have a well protected authorization agreement when releasing data, but not all of them is able to afford the cost of making agreement for each data sharing. Therefore, a standard sample of contract that can be widely adopted plays a very important role for open private data. A data sharing platform would be a solution to help data owners sharing their own data. It can not only provide a convenient way to collect profit from data sharing but help data owners avoiding legal risks with the platform’s standard agreement. All the data owners have to do is just to transfer their own data to the platform without concern since the platform would handle other affairs. Ⅴ. Conclusion Actively engaging the private sector in the open data value-chain is considered an innovation imperative as it is highly related to the development of information economy. Although many works still need to be done such as identifying mechanisms for catalyzing private sector engagement, these works can be done by organizations such as the World Bank and the Centre for Open Data Enterprise. Private-public collaboration is also important when it comes to strengthening the global data infrastructure, and the benefits of open data are diverse and range from improved efficiency of public administrations to economic growth in the private sector. However, open private data is not the goal but merely a start for open data revolution. It is to add variation for other organizations and individuals to analyze to create innovations while individuals, private sectors, or government will benefit from that innovation and being encouraged to release much more data to strengthen this data circulation. [1] Global Open Data Index, https://index.okfn.org/place/(Last visited: May 15, 2017)
Brief Introduction to Taiwan Social Innovation PoliciesBrief Introduction to Taiwan Social Innovation Policies 2021/09/13 1. Introduction The Millennium Development Goals (MDGs)[1] set forth by the United Nations in 2000 are carried out primarily by nations and international organizations. Subsequently, the Sustainable Development Goals (SDGs) set forth by the United Nations in 2015 started to delegate the functions to organizations of all levels. Presently, there is a global awareness of the importance of balancing “economic growth”, “social progress”, and “environmental protection” simultaneously during development. In the above context, many similar concepts have arisen worldwide, including social/solidarity economy, social entrepreneurship and social enterprise, and social innovation. Generally, social innovation aims to alter the interactions between various groups in society through innovative applications of technology or business models, and to find new ways to solve social problems through such alterations. In other words, the goal is to use innovative methods to solve social problems.The difference between social innovation and social enterprise is that social enterprise combines commercial power to achieve its social mission under a specific perspective, while social innovation creates social value through cooperation with and coordination among technology, resources, and communities under a diversified nature. 2. Overview of Taiwan Social Enterprise Policy To integrate into the global community and assist in the development of domestic social innovation, Taiwan’s Executive Yuan launched the “Social Enterprise Action Plan” in 2014, which is the first policy initiative to support social enterprises (from 2014 to 2016).Under this policy initiative, through consulting with various ministries and applying methods such as “amending regulations”, “building platforms”, and “raising funds”, the initiative set to create an environment with favorable conditions for social innovation and start-ups. At this stage, the initiative was adopted under the principle of “administrative guidance before legislation” in order to encourage private enterprise development without excessive burden, and avoid regulations restricting the development of social enterprises, such as excessive definition of social enterprises. Moreover, for preserving the original types of these enterprises, this Action Plan did not limit the types of social enterprises to companies, non-profit organizations, or other specific types of organizations. To sustain the purpose of the Social Enterprise Action Plan and to echo and reflect the 17 sustainable development goals proposed in SDGs by the United Nations, the Executive Yuan launched the “Social Innovation Action Plan” (effective from 2018 to 2022) in 2018 to establish a friendly development environment for social innovation and to develop diversified social innovation models through the concept of “openness, gathering, practicality, and sustainability”.In this Action Plan, “social innovation” referred to “social innovation organizations” that solve social problems through technology or innovative business models. The balancing of the three managerial goals of society, environment value, and profitability is the best demonstration of the concept of social innovation. 3. Government’s Relevant Social Enterprise Policy and Resources The ministries of the Taiwan Government have been promoting relevant policies in accordance with the Social Innovation Action Plan issued by the Executive Yuan in 2018, such as the “Registration System for Social Innovation Enterprises” (counseling of social enterprises), the “Buying Power - Social Innovation Products and Services Procurement”, the “Social Innovation Platform” established by the Ministry of Economic Affairs, the “Social Innovation Manager Training Courses”, the “Promoting Social Innovation and Employment Opportunities” administered by the Ministry of Labor, and the “University Social Responsibility Program” published by the Ministry of Education. Among the above policies stands out the measures adopted by the Ministry of Economic Affairs, and a brief introduction of those policies are as follows: i. Social Innovation Platform To connect all resources involved in social issues to promote social innovation development in Taiwan, the Ministry of Economic Affairs established the “Social Innovation Platform”.[2] With visibility through the Social Innovation Platform, it has become more efficient to search for targets in a public and transparent way and to assist with the input of resources originally belonging to different fields in order to expand social influence. As a digital platform gathering “social innovation issues in Taiwan,” the Social Innovation Platform covers multiple and complete social innovation resources, which include the “SDGs Map” constructed on the Social Innovation Platform, by which we can better understand how county and city governments in Taiwan implement SDGs and Voluntary Local Review Reports, and which allow us to search the Social Innovation Database[3] and the registered organizations, by which citizens, enterprises, organizations, and even local governments concerned with local development can find their partners expediently as possible, establish service lines to proactively assist public or private entities with their needs/resources, and continue to enable the regional revitalization organizations, ministries, and enterprises to identify and put forward their needs for social innovation through the function of “Social Innovation Proposals”, which assist social innovation organizations with visibility while advancing cooperation and expanding social influence. In addition, the “Event Page” was established on the Social Innovation Platform and offers functions, such as the publishing, searching, and sorting of events in four major dimensions with respect to social innovation organization, governments, enterprises, and citizens; and encourages citizens, social innovation organizations, enterprises, and governments to devote themselves via open participation to continuously expande the influence of the (Civic Technology) Social Innovation Platform. The “Corporate Social Responsibility Report” collects the corporate social responsibility reports, observes the distribution of resources for sustainable development by corporations in Taiwan, offers filtering functions by regions, keyword, popular rankings, and or SDGs types, and provides contact information and a download function for previous years’ reports, in order to effectively assist social innovation organizations to obtain a more precise understanding of the status quo, needs, and trends with respect to their development of respective products and services. Figure 1: SDGs Map Reference: Social Innovation Platform (https://si.taiwan.gov.tw/) Figure 2: Social Innovation Database Reference: Social Innovation Platform (https://si.taiwan.gov.tw/) Figure 3: Social Innovation Proposals Reference: Social Innovation Platform (https://si.taiwan.gov.tw/) Figure 4: Event Page Reference: Social Innovation Platform (https://si.taiwan.gov.tw/) Figure 5: Corporate Social Responsibility Report Reference: Social Innovation Platform (https://si.taiwan.gov.tw/) ii. Social Innovation Database To encourage social innovation organizations to disclose their social missions, products and services, and to guide society to understand the content of social innovation, and to assist the administrative ministries to be able to utilize such information, the Ministry of Economic Affairs issued the “Principles of Registration of Social Innovation Organizations” to establish the “Social Innovation Database”. Once a social innovation organization discloses the items, such as its social missions, business model, or social influence, it may obtain the relevant promotional assistance resources, including becoming a trade partner with Buying Power (Social Innovation Products and Services Procurement), receiving exclusive consultation and assistance from professionals for social innovation organizations, and becoming qualified to apply to entering into the Social Innovation Lab.Moreover, the Ministry of Economic Affairs is simultaneously consolidating, identifying, and designating the awards and grants offered by the various ministries, policies and measures in respect of investment, and financing and assistance, as resources made available to registered entities. As of 25 May 2021, there were 658 registered social innovation organizations and 96 Social Innovation Partners (enterprises with CSR or ESG resources that recognize the cooperation with social innovation under the social innovation thinking model may be registered as a “Social Innovation Partner”).The public and enterprises can search for organizations registered in the Social Innovation Database through the above-said Social Innovation Platform, the search ability of which advances the exposure of and the opportunities for cooperation with social innovation organizations. Figure 6: Numbers of registered social innovation organizations and accumulated value of purchases under Buying Power Reference: Social Innovation Platform(https://si.taiwan.gov.tw/) iii. Buying Power - Social Innovation Products and Services Procurement In order to continue increasing the awareness on social innovation organizations and related issues and promote responsible consumption and production in Taiwan, as well as to raise the attention of the commercial sector to the sustainability-driven procurement models, the Ministry of Economic Affairs held the first “Buying Power - Social Innovation Products and Services Procurement” event in 2017. Through the award system under the Buying Power, it continues to encourage the governments, state-owned enterprises, private enterprises, and organizations to take the lead in purchasing products or services from social innovation organizations, to provide the relevant resources so as to assist social innovation organizations to obtain resources and to explore business opportunities in the markets, to practice responsible consumption and production, and to promote innovative cooperation between all industries and commerce and social innovation organizations. The aim of the implementation of the Buying Power is to encourage the central and local governments, state-owned enterprises, private enterprises, and non-governmental organizations to purchase products or services from organizations registered in the Social Innovation Database, while prizes will be awarded based on the purchase amounts accumulated during the calculation period. The winners can obtain priority in applying for membership in the Social Innovation Partner Group, with corresponding member services, in the future. Under the Social Innovation Platform, both the amount of purchase awards and the number of applicants for special awards continue to increase.So far, purchases have accumulated to a value of more than NT$1.1 billion (see Figure 6), and more than 300 organizations have proactively participated. iv. Social Innovation Mark In order to promote public awareness of social innovation, the Ministry of Economic Affairs has been charged with the commissioned task of promoting the Social Innovation Mark, and issued “ The Small and Medium Enterprise Administration of the Ministry of Economic Affairs Directions for Authorization of the Social Innovation Mark” as the standard for the authorization of the Social Innovation Mark. Social innovation organizations can use the Mark, through obtaining authorization, to hold Social Innovation Summits or other social innovation activities for promoting social innovation concepts. In order to build the Mark as a conceptual symbol of social innovation, the Ministry of Economic Affairs has been using the Social Innovation Mark in connection with various social innovation activities, such as the Social Innovation Platform, the Buying Power, and the annual Social Innovation Summit. Taking the selection of sponsors of the Social Innovation Summit in 2022 as an example[4], only organizations that have obtained authorization of the Social Innovation Mark can use the Mark to hold the Social Innovation Summit. Figure 7: The Social Innovation Mark of the Small and Medium Enterprise Administration, Ministry of Economic Affairs IV. Conclusion The “Organization for Economic Cooperation and Development” (OECD) regards social innovation as a new strategy for solving future social problems and as an important method for youth entrepreneurship and social enterprise development.Taiwan’s social innovation energy has entered a stage of expansion and development. Through the promotion of the “Social Innovation Action Plan,” the resources from the central and local governments are integrated to establish the Social Innovation Platform, the Social Innovation Database, the Social Innovation Lab, and the Social Innovation Mark. In addition, incentives such as the Buying Power have been created, manifesting the positive influence of Taiwan’s social innovation. [1] MDGs are put forward by the United Nations in 2000, and are also the goals requiring all the 191 member states and at least 22 international organizations of the United Nations to be committed to on their best endeavors, including: 1. eradicating extreme poverty and hunger, 2. applying universal primary education, 3. promoting gender equality and empowering women, 4. reducing child mortality rates, 5. improving maternal health, 6. combatting HIV/AIDS, malaria, and other diseases, 7. ensuring environmental sustainability, and 8. establishing a global partnership for development. [2] Please refer to the Social Innovation Platform: https://si.taiwan.gov.tw/. [3] Please refer to the Social Innovation Database: https://si.taiwan.gov.tw/Home/Org_list. [4] Please refer to the guidelines for the selection of sponsors of the 2022 Social Innovation Summit: https://www.moeasmea.gov.tw/files/6221/4753E497-B422-4303-A8D4-35AE0B4043A9
A Discussion on Introducing the Concept of “Government Procurement Innovation” and Suggestions for LegislationI. Introduction In Finland, the Finnish Funding Agency for Technology and Innovation, or TEKES1, has proposed the Innovations in Public Procurement, or IPP2, which can be seen as the origin of innovative government procurement solutions all over the world. As such, this paper is an attempt to explore the possibility of introducing improvements to government innovation, within procurement in the Republic of China (ROC). The IPP scheme of Finland may be used as an observational tool for the analysis of innovative ideas within the international community, for comparison with government procurement, the legislation of the scientific research subsidy, and scientific research procurement currently effective in ROC. The findings could serve as a reference for related government agencies. The concept of Public Procurement of Innovation, or PPI, in the EU could serve as the benchmark for the ROC on studying the feasibility of introducing this system. In this paper an analysis of the legal system of the ROC will be conducted in the first place to clarify the objective of introducing the concept of PPI into existing legal procedures. This is particularly the case, since that subsidy and procurement do indeed form the two-pronged policy that is currently in effect. First of all, is PPI essential to the systems that could be or could only be enforced under “government procurement”? Secondly, could PPI be introduced into relevant procedures, as explained in preceding sections? Are there any provisions of law that could be amended for such a purpose? And in what direction should we focus our attention? The concept of PPI is a solution under rapid social change, certain products or services are scarce or absent for coping with the needs of rapid social change, to the extent that an innovative solution is necessary. In addition, government procurement is the tool for encouraging the proposal of innovative solutions to mold a friendly market through the participation of the users. (But we have to be cautious. This need is different from green procurement, which requires government procurement to create a market of pre-commercialized purchase 3.) The procurement and innovation subsidy by TEKES of Finland takes the public sector as the recipients of subsidy so that the recipients of subsidy could introduce the mode of dialogue between the users and the suppliers in the course of procurement. At the planning stage of the IPP in Finland, government agencies could receive a subsidy ranging from 25% to 75% of expenditure (including the provision of technology dialogue with different targets, long-term development analysis, the design of the specification for the subject matter that is purchased comparison of different solutions) for the service programs provided by the suppliers. During the implementation stage of procurement, purchasing government agencies could also receive a subsidy of 75% for expenditure on innovation projects procured by the government under subsidy at planning stage, on the performance of tasks during research and development at the implementation stage. Or, they could be subsidized up to 50% for spending on tasks beyond research and development. The content of subsidy includes equipment, service (including management fees), travelling expenses, and other necessary expenses. The recipients of a subsidy from TEKES at these two stages, is dictated by the extent to which these government agencies are able to introduce the spirit of procurement innovation at planning and implementation stages. As such, the legal foundation for the introduction of PPI into scientific research subsidy within the ROC will be an immediate concern. In concrete terms, this is the legality of the agency for advocacy of industrial technology research and development in subsidizing government agencies using national science and technology development funds of the Executive Yuan (also known as Science Development Fund); the legality of the authority of Industrial Technology Department in subsidizing other departments of the public sector, and the issues of the applicability of the Scientific Research Procurement Monitoring Regulation to the appointment of external institutions for conducting market surveys on such needs by the public sector (collectively known as “the issues of subsidizing for innovation”). In seeking a solution on subsidy, we still have to fit dialogue between the recipients of a subsidy during the course of a ‘procurement’ project, within the legal framework currently in force. The fundamental spirit and primary concern for government procurement in the ROC, for example, will be the prevention of misconduct and corruption during the procurement procedure4. It is necessary to state such a requirement within the law, in order to avoid allegations of manipulation during the bidding process. Only by so doing could the spirit of PPI be introduced into the process. In other words, it would be a matter of sorting out the recipients of scientific research subsidy, government procurement, and scientific research procurement without causing a contradiction between “the participation of the suppliers and users of the end-requirement or service, in the determination of the specification, terms and conditions of the procurement” from the PPI of Finland and the applicable laws currently in force. It would be necessary to design the details of the procedures (collectively known as the “issues of innovation dialogue”), which takes up the second part of this research. In summary, this paper aims to explore the dialogue of aspects of government procurement, scientific research subsidy, and scientific research procurement. It is also an attempt to analyze the gravity of PPI and the dialogue. Finally, the findings of the discussion on the introduction of the concept of PPI to science and technology projects of the ROC (which may also be extended to the subsidy of the research and development in science and technology by the public sector of the ROC) will be presented, with consultation and recommendations for legislation. II. Analysis of the dialogue in the process of government procurement, scientific research subsidy, and scientific research procurement in the ROC (I) There is more than one tool within the ROC for the encouragement of research and development in science and technology Governments of different countries possess different policy tools to support or encourage the private sector in the research and development of science and technology in order to shore-up insufficient resources. From the perspective of government budgeting, the design of procedures may be identical or different. For example, the US federal government instituted the Federal Acquisition Regulation, FAR, and defined “acquisition” as “the acquiring by contract with appropriated funds of supplies or services (including construction) by and for the use of the Federal Government through purchase or lease, whether the supplies or services are already in existence or must be created, developed, demonstrated, or evaluated” 5. In light of the variation between its specific features and other services, Research and Development Contracting has been specifically regulated in section 35 of FAR, which states: “The primary purpose of contracted R&D programs is to advance scientific and technical knowledge and apply that knowledge to the extent necessary to achieve agency and national goals. Unlike contracts for supplies and services, most R&D contracts are directed toward objectives for which the work or methods cannot be precisely described in advance. It is difficult to judge the probabilities of success or required effort for technical approaches, some of which offer little or no early assurance of full success. The contracting process shall be used to encourage the best sources from the scientific and industrial community to become involved in the program and must provide an environment in which the work can be pursued with reasonable flexibility and minimum administrative burden. 6” In the EU, they defined research and development beyond government procurement regulation: According to Council Directive 92/50/EEC, or known as EU Directive, the scope of application as stated in paragraph (a) of article 1, “public service contracts shall mean contracts for pecuniary interest concluded in writing between a service suppliers and a contracting authority” with list of the exclusion conditions, where clause (ix) states: “research and development service contracts other than those where the benefits accrue exclusively to the contracting authority for its use in the conduct of its own affairs, on condition that the service supplied is wholly remunerated by the contracting authority. 7” As such, we can see the difference in legal requirements between the EU and USA. Whether such procurement is a special form of government procurement, or whether research and development falls beyond the regulation of government procurement procedure, it nonetheless falls under a government budget for the encouragement of technology research and development, and said research and development “cannot be forecast and not to be directly used by the procurement agency8 ”. Under the legal system of the ROC, it is a policy tool for the encouragement of research and development in science and technology, and could be classified as government procurement, scientific research subsidy, and scientific research procurement. For scientific research subsidy, Article 9 of the Industrial Innovation Statue of the ROC 9 provides the legal origin. For example, the technology projects administered by the Ministry of Economic Affairs have been established under this law. Accordingly, the Regulation Governing the Subsidy of Research Institutions in Industrial Innovation and Research and Development Advocated by Ministry of Economic Affairs (hereinafter, “institutional scientific project regulation”), the “Ministry of Economic Affairs Regulation Governing the Subsidy and Supervision for Assistance of Industrial Innovation (hereinafter, “Industrial Scientific Project Regulation”), and the “Regulation Governing the Subsidy of Academic Institutions in Industrial Innovation and Research and Development Advocated by Ministry of Economic Affairs (hereinafter, “Academic Scientific Project Regulation” for subsidizing research and development in industrial technologies10. The result of research and development shall be released to the administering body as required by Article 6 of the Fundamental Science and Technology Act 11. In the ROC, the result of science and technology projects shall be transferred to Ministry of Economic Affairs 12, which is similar to the requirement in the EU. This could be exemplified by the EU example as mentioned13 that the appointing agency is not entitled to any interest of the result. Government procurement is a vital policy tool of the government in subsidizing research and development. According to Article 2 of the Government Procurement Act 14, procurement as referred to in this law covers the outsourcing of service. Article 7 (paragraph 3) of the same law also requires that, service shall cover professional service, research and development. As such, the government will naturally adopt the means of government procurement in promoting its policy for encouragement of research and development in science and technology. Procurement is different from subsidy. The former entails an “inspection for acceptance” procedure, and the end users of the latter may not be the government. This point is different from the EU Directive in procurement 15. The third kind of tool in the ROC for the encouragement of research and development is scientific research procurement. According to Article 6 (paragraph 4 16) of the Fundamental Science and Technology Act, public schools, public research agencies (institutions), non-profit organizations or groups receiving a government subsidy or appointed by the government as stated in paragraph 1, or public research agencies (institutions) proceed to procurement by preparing a budget for research and development in science and technology under law. We could analyze this issue from three aspects: 1. Public schools, public research agencies (institutions), non-profit organizations or groups may receive government subsidy as stated in paragraph 1, Article 6 of the Fundamental Science and Technology Act for procurement; 2. Public schools, public research agencies (institutions), non-profit organizations or groups may proceed to procurement at the appointment of the government as stated in paragraph 1, Article 6 of the Fundamental Science and Technology Act for procurement; and 3. Public research agencies (institutions) proceed to procurement by preparing a budget for research and development in science and technology under the law 17. In detail, this specific mode of scientific research procurement has its origin in Article 4 of the Government Procurement Act. The cause of the legislation for this article, dated May 27 1998, specified that: “When non-profit organizations or groups receive government subsidy for procurement, and if the amount of subsidy exceeds half of the total amount of procurement and the amount of subsidy is subject to announcement, such procurement shall be governed by this article and subject to the monitoring of the subsidizing agencies to prevent misconduct and corruption”. As such, the recipients of subsidies shall be governed by the Government Procurement Act after passing through the due procedure of subsidy if the amount of procurement meets the standard for announcement. The purpose is to prevent misconduct and corruption. Or it would not be necessary for the government to intervene, given the subsidy has been supported by its legal source in the determination of the recipients and the procedure for entering into subsidy agreement. Indeed, this is the specific feature of the Government Procurement Act of the ROC. The same principle applies to scientific research procurement in the ROC (excluded from the application of Article 4 of the Government Procurement Act), and not the exclusion of the application of the Government Procurement Act to the subsidy procedure 18. (II) Analysis of the dialogue in the process of government procurement, scientific research subsidy, and scientific research procurement III. The dialogue of government procurement In government procurement, the regulations governing an invitation to tender and decision of award require that the party for the design of the content of procurement shall be the same party in the bidding process, to avoid alleged manipulation of the bidding process. For example, Article 39 of the Government Procurement Act (paragraph 2 and 3) requires that, “The deputy agent or partners of contractor undertaking the project management shall not be the deputy agent or partners in the planning, design, construction, or of the suppliers”. Article 38 of the Enforcement Rules of the Government Procurement Act requires that, “In tender invitation, the entity shall require explicitly in the tender invitation documents that if any of the following applies to a specific bidder, such bidder shall not participate in the bidding process, as the recipient of the award, or subcontractors of the award, or assisting the bidder: 1. The contractor that provides the planning and design service shall proceed to procurement on the basis of the planning and design result”. As such, the purpose of the Government Procurement Act aims at the impartiality and neutrality of the planning of project “to prevent funneling of interest, helping each other in manipulation of the bidding process, and the bidder also assumes the role of judge during the bidding process 19”. Indeed, there is still the possibility for hearing opinions from outside the procurement entity in the procurement cases under the Government Procurement Act. The government procurement system of the ROC could be seen as a system featuring a mechanism for dialogue. The “Particulars for Implementation of Public Viewing of Documents of Public Work Tender Invitation” 20 (hereinafter, Public Viewing Particulars) could serve as an example for the introduction of user needs dialogue. The Public Viewing Particulars require that the documents for public viewing shall include the schematics of the project, the sample version of contract, sample of affidavit, sample of important notice to bidding, bill of quantities and specifications, and other documents related to the specific characters of the projects (Number 3 of the Public Viewing Particulars). The purpose of viewing is an invitation for the opinions from the contractors or the public, which will be compiled and forwarded to the organizer of the project for processing before making an announcement for invitation to tender (Number 8 of the Public Viewing Particulars). As such, public opinions could be presented at this stage as a response to the content of the aforementioned documents in addition to the contractors. There is no delineated scope of public opinion, and could cover the objective content of the procurement. However, the type of projects subject to public viewing are of a specific nature or the amount of the engineering projects shall be subject to an audit (Number 2 of the Public Viewing Particulars), which excludes the procurement of research and development. In addition, the purpose of the Public Viewing Particulars is the transparency and openness of the tender invitation process for public work. Through the public viewing of tender invitation documents, the opinions from the contractors or the public can be heard. This can help to upgrade the quality of the planning and design of public works projects and reduce possible disputes deriving from tender invitations or performance of contract (Number 2 of the Public Viewing Particulars). As such, the purpose of this arrangement is not aimed at the necessity of the procurement of engineering projects. The possibility of applying the concept of PPI to this system of public viewing could be considered. If we think of the content for public viewing as including the schematics of the projects, the subject matter of the purchase is very substantive. In the future, it is expected that the objective of public viewing shall include subject matters that do not yet have a concrete plan, but still the opinions of the user and producer would be properly heard. 1. The dialogue of scientific research subsidy In the domain of scientific research subsidy of the ROC, the topics for subsidy are selected through the top-down mode. According to Article 7 of the institutional scientific project regulation, “The MOEA shall invite the experts from the industry, government agencies (institutions), academic and research institutions to meetings for strategic planning of industrial innovation and research and development, and consider the opinions from these social sectors to design for the direction of industrial innovation and research and development in the future”. Article 11 of the same regulation also requires that, “The MOEA may unleash the urgent industrial technology development plan on industrial technology that needs to be launched urgently as approved by MOEA or Executive Yuan”. As such, the law has already included the opinions and thoughts from the industry, government, and the academeia in designing of the recipient of subsidy. As compared with the measures adopted in Finland, this regulation is different, and the practice of Finland aims at obtaining suggestions during the course of “procurement”. Or, we could say that the introduction of the PPI concept in the subsidy mechanism could help to broaden the scope of the legal adjustment. Under the scientific project subsidy mechanism currently in effect, if we do not cut into the problem from the aforementioned mode of topic selection for subsidy, the cooperative education activities in the course of the execution of the subsidy plan are emphasized in the subsidy of scientific project for the institutions, academia, and industry 21. Further to the requirements of the regulation in principle, a variety of options could be used for integrating the needs of the industry in order to achieve the goal of the dialogue for “encouraging” research and development and the needs of the industry in practice. Individual agreements can help to achieve this goal. Currently, there are requirements specified in the notice to applicants for scientific projects within the field of academia, which feature detailed requirements for our analysis. We could take the prototype important notice to applicants (general academic scientific project) and the requirements therein commonly used in the development of industrial technology projects by the academic circle. To encouraging close cooperation between schools and the industry and research institutions, the source of funding for the projects shall be incorporated with the fees for supporting bodies with the requirements for the relevant proportion of funding on the basis of the domain of the subject matter of the project topic and the geographic location of the schools 22. If we take a closer look at the important notice of the application for a local academic development of an industrial technology project (local academic technology project), we could see that the system design features the needs of local industry. A local academic technology project is positioned for the upgrading of the research and development of specific technologies of local industries and the advocacy of regional industrial development with regional characteristics. As such, the items eligible for subsidy are innovative, prospective or critical technologies required by the industry, or modes of operation, corporate management skills or innovative service advantageous for industrial development 23. As such, the applicants must attach the letter of intent issued by at least three enterprises in the application procedure, and can prove that the objective of the project for subsidy is to a certain extent meeting the needs of local industry. 2. The dialogue of scientific research procurement For scientific research procurement, the “Regulations Governing Procurements for Scientific and Technological Research and Development” (hereinafter, “Monitoring Regulation”) instituted at the authorization of the Fundamental Science and Technology Act serves as the legal source for the entities or procurement authority to undertake scientific research procurement. The Monitoring Regulation aims at monitoring and management and also provides the legal environment for dialogue for scientific research procurement. This could be the starting point for scientific research procurement innovation. According to Article 7 of the Monitoring Regulation, “Where necessary, public schools, public research agencies (institutions), non-profit organizations or groups may proceed to consultation with the suppliers respecting the works for procurement, the specifications of properties or service needs before entering into agreement on scientific research procurement”. As such, the requirements under the Monitoring Regulations allow flexibility for the procurement authority in pursuing scientific research procurement, as they can engage in consultation with the ‘suppliers’. The topics for consultation covered the works for procurements, the specification of properties or service needs. There is one thing that needs to be differentiated, the mechanism of “consultation”, which is different from the consultation under the Government Procurement Act. Consultation as specified in the Government Procurement Act is a kind of supplementary measure applicable only when no decision of award can be made to the best bid 24, or it is difficult to determine the best bid 25. In addition, only the provisions contained in the original documents labeled as amendable could fall into the scope of consultation 26. As such, the subject matter of procurement specified in the tender invitation document shall be the fundamental requirement of the procurement case. In other words, the procurement authority has already known the purchase needs, which is different from the tentative IPP scheme of Finland. The latter aims at the encouragement for the participation of the suppliers of the service and the users in the process of determining the specification for procurement, and the terms and conditions of procurement, which is an immediate concern of the government for solutions and the development of the state to tackle challenges in the future. In other words, the IPP scheme of Finland aims at providing a solution for the procurement authority and the content of procurement is uncertain or is difficult to define due to the rapid change in the environment. (III) Concluding remarks─ the subject matter of dialogue under the concept of PPI and the possibility of preventing misconduct and corruption The study of this section leads to a preliminary conclusion that the legal framework of ROC for scientific research subsidy, government procurement, and scientific research procurement provides the mechanism for possible dialogues between the subsidy providers/procurement authority and the recipients of subsidy/bidders. Even the public viewing system of government procurement could incorporate the channels for public opinions. These could serve as the starting points for the introduction of PPI concept. Yet, there are two points to be clarified and resolved if we compare the aforementioned legal system and the PPI concept of the EU or the implementation of the IPP scheme in Finland if we are to introduce related practices First of all, if we elect to understand the aforementioned mechanism of government procurement and scientific research procurement from the perspective of dialogue/participation mechanism, the participants in the dialogues are still the subsidy providers or procurement authority and the service/goods suppliers. It is not a dialogue directly involving the users of public service (at this point, we could see the eventual purpose of the result of research and development as a form of public service). However, the spirit of the system currently in effect aims at matching the users for an indirect dialogue through this mode to a certain extent. For example, the integration of the academic scientific research project with the intent of the general and local participating firms as a necessary condition in the application, which approximates the mode of dialogue with the users of public service in the future. This arrangement is made in consideration that the firms and the market are the closest entities in the process, and is incorporated as a part of the user needs (of course, if we equate the two parties, there is the risk that the firms orchestrate market needs or making profits as the primary goal). Secondly, the gravity of the law in the ROC rests with the prevention of misconduct and corruption. This is particularly the case in the Government Procurement Act. Therefore, the foremost issue of introducing the concept of government procurement innovation to the ROC, that is the design of a system that features a mechanism for the prevention of misconduct and corruption to avoid “manipulation of the bidding process”, is yet to be resolved, and will be discussed later in this paper. IV. Analysis of the introduction of PPI into the laws governing scientific research subsidy, government procurement, and scientific research procurement (I) Suggestions and thoughts for the incorporation of PPI into the legal framework of government procurement Article 39 of the Government Procurement Act and Article 38 of its implementation procedure have set forth strict criteria for the prevention of “participants who also act as judges”. Yet, the so-called “contractors providing planning and design service” do not apply to all contractors that have provided planning suggestions but particularly point to the contractors that have been appointed by the entity to engage in the planning, design, or working on the preparation of tender invitation documents 27. In practice, the parties concerned tended to “keep a distance from” the prospective bidders in order to avoid inadvertent violation of the law. As such, there is an exception in law that excludes situations of no conflict of interest or no unfair competition 28. If we are to introduce the concept of PPI into government procurement of science and technology research and development, additional provisions must be added to the aforementioned law to provide explicit legal grounds for practice, before the entities can possibly or willingly introduce dialogue between the supplier and the user. As for the public viewing system in existence, it provides the possibility of a similar setting under the same spirit. As explained, the subject matter for receiving public opinions is still the content of the plan, which is different from the dialogue between the “supplier” and the “users’ being encouraged in the procurement planning stage under IPP in Finland. In summary, suggestions for introducing PPI to government procurement practice of the ROC within the legal framework are detailed below: First, the Government Procurement Act primarily aims at the prevention of misconduct and corruption. The introduction of the PPI concept entails higher cost of legislation, which requires amendment to the procurement act to provide the legal grounds. At the same time, the reconciliation with the rule of avoidance of the conflict of interest current practiced in procurement and the settlement of relate issues shall also be taken in account. Second, it could be possible to include the procurement of professional service or research and development in the Public Viewing Particulars in order to introduce the concept of PPI. In so doing, we must consider the entrance barrier on the procurement of engineering projects previously covered by the Public Viewing Particulars. This may be designed for avoiding the incurrence of additional administrative cost and bolstering administrative efficiency (for example, the procurement of engineering projects not exceeding specific amount, the addition of the requirement of public viewing, may delay the procurement procedure and hamper competition). For the outsourcing of professional services or research and development, appropriate consideration should be taken. (II) Suggestions and thoughts for the incorporation of PPI into the legal framework of scientific research subsidy The legal sources for governing scientific research subsidy are Article 7 and Article 11 of the institutional scientific project regulation, as in the case of the Ministry of Economic Affairs, and the important notice to applicants for general and local academic technology projects in their design. First, Article 7 of the institutional scientific project regulation requires that, Ministry of Economic Affairs shall invite experts from the industry, government agencies (institutions), academia and research institutions to the strategic planning of industrial innovation and research and development and consider the opinions from these experts in order to plan for the direction of industrial innovation and research and development in the future. The planning of the direction for innovation research and development could be included as an item for the development of industrial technology and should be the direction expected by all. For example, the Ministry of Economic Affairs has held the “National Industrial Development Conference” in December 2012, and opened to public opinions on four reformations in three industries on the advocacy of adding value to industrial innovation, structuring of positive investment environment, and other common topics. This is similar to PPI, which may include the absorption of and communication with the opinions of the “users”. But there is one point of variation. This is a matter of the use of planning strategy, and is the planning of the overall industrial technology development direction from top-down. In PPI, this will be the direct dialogue between the suppliers of service/properties and the end users in order to encourage the innovative solutions for the procurement. They may be at different levels. Second, the principle for the subsidy of general and local academic scientific projects requires the funding in proportion of the participating units or the letter of intent signed by the owners of at least three enterprises, which could be stated as the requirement of cooperative education programs. Article 12 of the institutional scientific project regulation, Article 8 of the academic scientific project regulation, and Article 4 of the industrial scientific project regulation have the provisions for encouraging cooperation education and could serve as the legal source for such a purpose. The pilot project of procurement in Finland adopted the dialogue between the prospective suppliers of service providers and the end users at the planning stage of procurement. This may be defying the principle of the procurement act. In the ROC, the subsidy procedure and the procurement procure are governed by different sets of laws. As such, the restriction of the Government Procurement Act does not exist in the legal rules governing the subsidy procedure. As such, there is little concern over the violation of the law. However, we have to pay attention to Article 6 of the Fundamental Science and Technology Act 29 on the issue of the avoidance of interest in the entitlement and use of the result of scientific research under government subsidy, at the appointment of or funded by the government. In other words, the legal rules governing subsidy have not restricted the possibility of dialogue between the “supplier” and “end users” of the science technology research and development project at the preliminary planning stage. The substantive terms of requirement are stated in Article 12-1 of the “Ministry of Economic Affairs Regulation Governing the Entitlement and Use of The Result of Science and Technology Research and Development”, the procurement authority shall establish the management mechanism or regulations, or report to the Ministry for record on the avoidance of the conflict of interest or related disclosure of the result of research and development. Attention is required for possible violation against related requirements of the avoidance of the conflict of interest and disclosure of the procurement authority. But if we take a closer look at the Fundamental Science and Technology Act in the aspect of the avoidance of the conflict of interest, and compare with the dialogue between the procurer and the users at the planning stage, there may be room for legality. It is because the Fundamental Science and Technology Act requires only the entitlement and use of the result of research and development, which is the output of the project, and not the avoidance of the conflict of interest at the planning stage and implementation stage. This is the difference in the substance. Even though there is no dialogue after the outcome of the project, the performer may still have a conflict of interest under certain circumstances, which should also be considered. For example, the procurement authority declares its position on the opinions presented at the planning stage is indeed the suggestion of the result of research and development of the only party that has the technical capacity in the technology market that can undertake the research and development. In summary, suggestions for introducing PPI to government scientific research subsidy projects in the ROC within the legal framework are detailed below: First, we could incorporate relevant dialogue mechanisms at the project planning stage, in a timely fashion and in accordance with the requirements for encouraging cooperative education within the legal framework of scientific research subsidy administered by the Ministry of Economic Affairs currently in effect. Second, legal rules governing scientific research subsidy administered by the Ministry of Economic Affairs currently in effect do not restrict any dialogue between the recipient of subsidy (the so-called “supplier”) and the “end user” at the planning stage or in the future, but whether or not such an act will violate the requirements of relevant procurement authority in the avoidance of conflict of interest, deserves our attention. (III) Suggestions and thoughts for the incorporation of PPI into the legal framework scientific research procurement In the domain of scientific project procurement, Article 7 of the Monitoring Regulation sets forth that suppliers may involved in consultation on issues related to the works for procurement, specification of properties, or service needs. This provides the legal source for the trial use of the IPP scheme of Finland in the ROC, but we have to consider two things. First, the provision sets for the consultation with the supplier only, and it is, by and large, the dialogue mechanism only after the determination of the subject matter of procurement, which is different from the IPP of Finland. Also, the dialogue with the end user does not fall within the scope of such legal source, and, there is still room to define who could be positioned as the “end user”. Yet, it is two sides of the same coin. There is a legal framework in place without detailed requirement. As such, the procurement authority may design the procedure in fuller detail in this space as needed. Finally, the scope of scientific research procurement in the ROC is not as broad as the subsidy cases (refer to the definition of scientific research procurement above). As such, the majority of scientific research procurement is already at the cooperative education stage under individual subsidy or appointment of the government (except the work under the scientific research and development budget prepared by the public research institutions). If we introduce the concept of PPI into the scientific research procurement stage, the content and the scope have already fallen into the framework of the previous subsidy plan, and there is little room for the incorporation of dialogue and opinions. In summary, the suggestions for introducing PPI to scientific research procurement of the ROC within the legal framework are detailed below: First, the Monitoring Regulation of scientific research procurement provides the mechanism for consultation but does not define the subject matter of consultation in procurement. As such, the scope for hearing opinions is limited. Further, the dialogue with the users has not been covered. The overall implementation procedure requires refinement for proper enforcement. Second, the scope of scientific research procurement is limited to the procurement under an individual subsidy program or at the appointment of the government, and falls within the scope of the content for the previous subsidy program or the program at the appointment of the government in principle. As such, the effect of introducing PPI is limited. V. Conclusion – A Discussion on Introducing the PPI into Science and Technology Projects and Suggestions for Legislation within the ROC The above are overall observations on the analysis of the introduction of PPI to scientific research subsidy, government procurement, and scientific research procurement in the ROC. In the “Issue of dialogue for innovation”, we should consider to start with scientific research subsidy. The primary reason is that there is room within the legal framework under the Monitoring Regulations governing scientific research procurement, but in practice, more substantive terms could be developed. However, the scope of the legal framework for the applicability of scientific research procurement is confined to the procurement made under subsidy or at the appointment of the government on specific programs. The effect of trial running PPI is very little under the framework of subsidy or appointment by the government. Finally, the feasibility of introducing PPI to the scientific research projects of the ROC, which is the “subsidy innovation issue”, is analyzed below: First, the legality of using scientific development fund to subsidize other government agencies: Article 5 of the “National Science and Technology Development Fund Management and Utilization Regulation of Executive Yuan” sets forth the use of the fund, including “expenditure on the advocacy of overall technology development of the nation”, “expenditure on the improvement of the research and development environment for science and technology”. As such, the introduction of the trial run of IPP schemes in Finland would comply with the aforementioned provisions. Second, the legality of subsidizing the public sector by advocating science and technology research and development, like the Department of Industrial Technology at the Ministry of Economic Affairs in the future: reference could be taken from Article 9 of the Ministry of Economic and Energy Affairs Articles of Association (Draft) under which the Department of Industrial Technology shall administer, “1. Strategic planning and implementation in technology under the jurisdiction of the ministry”, and the “planning of technology funding resources, and the establishment of implementation system and evaluation system”. As such, the model of the IPP scheme of Finland is not compatible with the authority and function of the Department of Industrial Technology. In other words, the Department of Industrial Technology shall not perform the function of subsidizing/advocating the duties of procurement innovation of other government agencies, but can introduce the concept of PPI for trial running within its scope of legal framework (e.g., scientific research procurement). Third, the issue of outsourcing for survey of market needs by the public sector on the applicability of the Monitoring Regulation. If the work for outsourcing is an item of work under previous subsidy or work at the appointment of the government, and the fund of the project for procurement is regulated by the Monitoring Regulations. However, for survey of market needs purely planned for subsidy by the entity or required by the procurement cases, they fall within the category of general procurement of service and the Government Procurement Act shall be applicable. In sum, the PPI concept under the FP7 of the EU has been subject to trial run through the IPP scheme of Finland. In Finland, the evaluation mechanism has not yet been fully established. Yet, such attempt to provide a solution for specific subject matter of procurement for the country that faces the rapid changing objective environment through the absorption of dialogue and opinions for innovative solutions is new in the world, and could be considered for adoption within the ROC that has similar challenges in the objective environment. As such, we could start with scientific research procurement. The evaluation of the result is promising; this could be incorporated into the design of the mechanism for scientific research subsidy. For the scope governed by the Government Procurement Act, it entails high cost for amendment, and should be left a subsequent choice for review and planning. 1.TEKES Homepage, http://www.tekes.fi/en/community/Home/351/Home/473 (last visited June 15, 2013). 2.The IPP scheme is the response of Finland to FP7 of the EU in proposing the Public Procurement of Innovative Solutions, PPI. In this paper, PPI and IPP share the same concept while the latter is the substantive name of the pilot project in Finland. See Huang Huei-Hsiang, “International Practice and Legal Analysis of the Advocacy of Government Procurement Innovation – a case study on IPP of TEKES, Finland”, Science and Technology Law Review, Vol. 25 No. 10. PP. 27-45 (2013), by. 3.Pre-commercial procurement, PCP, is the procurement of the government for creating a market and appeals mainly to the service supplier with emphasis the difference from the dialogue between the users and the suppliers. 4.Article 1 of the Government Procurement Act, “This law is instituted for the establishment of a government procurement system to the extent of setting up a fair and transparent procurement procedure, upgrade the efficiency and function of procurement, and guarantee the quality of procurement”. Although this law is instituted for achieving the objective of upgrading procurement efficiency and function, and guarantee of procurement quality, the procedure of the Government Procurement Act aims at keeping distance with the prospective contractors in the procurement process to avoid possible allegation of manipulation of the bidding process, monopoly of the tender, and profit seeking. 5.Federal Acquisition Regulation 2.101, “Acquisition’ means the acquiring by contract with appropriated funds of supplies or services (including construction) by and for the use of the Federal Government through purchase or lease, whether the supplies or services are already in existence or must be created, developed, demonstrated, and evaluated.” FAR Home Page, https://www.acquisition.gov/far/current/html/Subpart%202_1.html#wp1145507 (last visited June 15, 2013). 6.Federal Acquisition Regulation 35.002, “The primary purpose of contracted R&D programs is to advance scientific and technical knowledge and apply that knowledge to the extent necessary to achieve agency and national goals. Unlike contracts for supplies and services, most R&D contracts are directed toward objectives for which the work or methods cannot be precisely described in advance. It is difficult to judge the probabilities of success or required effort for technical approaches, some of which offer little or no early assurance of full success. The contracting process shall be used to encourage the best sources from the scientific and industrial community to become involved in the program and must provide an environment in which the work can be pursued with reasonable flexibility and minimum administrative burden.” FAR Home Page, https://www.acquisition.gov/far/current/html/FARTOCP35.html#wp223483 (last visited June 15, 2013). 7.“For the purposes of this Directive: (a) public service contracts shall mean contracts for pecuniary interest concluded in writing between a service provider and a contracting authority, to the exclusion of:…(ix) research and development service contracts other than those where the benefits accrue exclusively to the contracting authority for its use in the conduct of its own affairs, on condition that the service provided is wholly remunerated by the contracting authority;” Council Directive 92/50/EEC, art. 1, 1992 O.J. (L 209) 1,3. 8.In “Critique of Scientific Research Procurement after the Amendment to Article VI of the Fundamental Science and Technology Act ”, in Science and Technology Law, Vol. 24, No. 10, PP, 29-32 (2012), by Chen Shih-Chieh. 9.Article 9 of the Industrial Innovation Statue, “Competent authorities at the central government may advocate the following in the form of subsidy or supervision: I. Encouragement of industrial innovation or research and development. II. Supply or industrial technology and supervision of industrial upgrading. III. Encouragement for the establishment of innovation or research and development center in the enterprises. IV. Assistance in the establishment of innovation or research and development institutions. V. Encouragement of cooperation among the industry, academic circle, and research institutions. VI. Encouragement of the input to schools by enterprises for the training and development of talents. VII. Augmentation of human resources in the industry. VIII. Assistance in the innovation of regional industries. IX. Any others that help to encourage industrial innovation or research and development. The recipients of the aforementioned subsidy or supervision, the qualification requirements, criteria for screening, application procedure, authority for approval, and other related rules and regulation shall be established by respective competent authority of the central government”. 10.For example, Article 4 of the academic scientific project regulation, “The MOEA shall subsidize academic institutions to perform the following research and development for the advocacy of industrial development and reinforcement of innovation capacity for the country…” 11.Article 6 of the Fundamental Science and Technology Act , “The parties for awarding science and technology research and development subsidized, appointed, funded by the government, or under a budget prepared by public research agencies (institutions) on science and technology research and development shall be determined by evaluation or review process with justifiable reasons for the evaluation and review. The resulting intellectual property rights and result in whole or in part shall be entitled to the pursuer of research and development or authorization for use irrespective of the restriction of state-owned properties”. 12.Article 6 of the Ministry of Economic Affairs Regulation Governing the Entitlement and Utilization of Science and Technology Research and Development Result, “The result of science and technology project of the pursuer shall be entitled to the pursuer unless otherwise specified in This Regulation”. 13.In the EU, the provision of “The procurement authority shall be responsible for all the expenses incurred from the service supply and the benefit so generated shall be owned by the procurement authority for its needs in operation” served as an exception of contracted service of research and development. In other words, the interpretation is inversely made to the extent that contracted service of research and development in the EU is not entitled to the procurement authority. 14.Article 2 of the Government Procurement Act, “Procurement as referred in this law shall be job order for work, the purchase, making to order, leasing of properties and the contract for service or employment”. Article 7 of the same law, “Work as referred to in this law shall be act of building, addition, renovation, remodeling, demolition of structures and equipment accessory to the structures above and below ground level, and the act to change the natural environment, including building, civil engineering Hydraulic engineering, water work, environment, transportation, machinery, electric, chemical engineering and any other engineering project recognized by the competent authority. Properties as referred to in this law are items(except fresh agricultural or aquacultural products), materials, equipment, machinery and other movables, real properties, rights, and other properties recognized by the competent authority. Service as referred to in this law shall be professional service, technical service, information service, research and development, corporate management, repair and maintenance, training, labor, and other forms of service recognized by the competent authority. Where the procurement may involve two or more of the aforementioned content, which made it difficult to identify the very nature, the content accounted for a larger proportion of the budget for total work shall stand”. 15.Op. Cit, Note 13. 16.Article 6 – Paragraph 4 of the Fundamental Science and Technology Act , “the Government Procurement Act shall not be applicable to public schools, public research agencies (institutions), non-profit organizations or groups receiving government subsidy or assignment, or procurement of public research agencies (institutions) under a budget of science and technology research and development prepared in compliance with applicable law unless otherwise specified in a treaty or agreement binding the ROC and a third country. Yet, they are subject to the monitoring of the subsidizing, assigning, or the competent authority. The regulation for monitoring and management shall be established by the competent authority in the central government”. 17.Op. Cit. Note 8, PP36-37. 18.Table of “Research and Development Projects” governed by the “Government Procurement Act” under Public Construction Commission, Executive Yuan Letter Chi-Tzi No. 89009844. The Government Procurement Act shall not be applicable to the selection of the recipients of subsidy. 19.The cause of legislation for Article 39 of the Government Procurement Act dated May 27 2998, “II. Paragraph II and III explicitly state that contractors may act on behalf of the entity in project management, and shall be in specific relation with the contractors responsible for the planning, design, construction of the project to avoid funneling of interest, cover up each other, and acting as a participant and the judge at the same time”. 20.Particulars for Public Viewing of Tender Invitation Documents of Public Works, at http://lawweb.pcc.gov.tw/LawContentDetails.aspx?id=FL029347&KeyWordHL=&StyleType=1 (last browsing date: 2013/6/15) 21.Article 12 of the Regulation Governing the Subsidy of Research Institutions in Industrial Innovation and Research and Development Advocated by the Ministry of Economic Affairs, “The MOEA or its functionaries shall encourage research institutions to introduce technologies, joint ventures in the development and participation in the pursuit of technology projects through interdisciplinary or cross-function cooperation for the effective integration of domestic and foreign research and development resources and capacity, the assistance of the upgrading of traditional industries, or advocacy of the development of knowledge service for the best interest of the industry”. Article 8 of the Regulation Governing the Subsidy of Academic Institutions in Industrial Innovation and Research and Development Advocated by the Ministry of Economic Affairs , “The MOEA shall request the applicants of academic technology projects to invite the joint participation of research institutions or companies and execute the academic technology project in interdisciplinary or cross-function mode of operation for the effective integration of research and development resources and capacities at home and abroad and create the optimized result in industry”. Article 4 of the Ministry of Economic Affairs Regulation Governing the Subsidy and Supervision for Assistance of Industrial Innovation, “The MOEA or its functionaries may provide subsidy for the following industrial innovative activities:… IV. Encouragement for joint venture among the industry, academia, and research institutions”. 22.Refer to important notice of application for general type of projects, IV. Types of subsidies for general academic scientific research projects. 23.Refer to important notice of application for local type of projects, III. The positioning, nature, and subsidy for local academic scientific research projects. 24.Article 55 of the Government Procurement Act, “Entities taking minimum offer for procurement and have been approved by the senior authority and announced in the notice of tender and the tender invitation documents and cannot determine the award pursuant to the requirements or preceding two articles may proceed to consultation”. 25.Article 56 of the Government Procurement Act, “ …if the evaluation result cannot determine the best bid on the basis of the decision of the head of entity or more than half of the members of the evaluation committee, proceed to consultation and comprehensive evaluation for determining the best bid”. 26.Article 57 of the Government Procurement Act, “Entity elects to proceed to consultation in accordance to the requirements specified in the previous two articles shall comply with the following principles: … III. The content of the original tender invitation documents to be revised shall be highlighted before proceeding to consultation”. 27.Paragraph 1, Article 39 of the Government Procurement Act, “Entities may assign the duties of project management in planning, design, supply, or performance of contract to a contractor in procurement under this law when making procurement”. 28.Paragraph 2, Article 38 of the Government Procurement Act Implementation Procedure, “Subsequent procurement procedure shall not be applicable to situations specified in I and II of the previous section if there is no alleged conflict of interest or unfair competition and at the approval of the entity”. 29.Paragraph 3, Article 6 of Fundamental Science and Technology Act , “The Executive Yuan shall coordinate and regulate the entitlement and utilization of the intellectual property right and result as mentioned in preceding two sections under the principle of equity and effectiveness, with reference to the proportion and contribution of capital and service, the nature, potential of utilization, social benefit, national security and the effect on the market of the result of science and technology research and development, and on the basis of its purpose, necessary condition, duration, scope, proportion in whole or in part, registration, management, distribution of incomes, avoidance of conflict of interest and the disclosure of related information, the intervention of the subsidizing agent in authorization of a third party, or procedure for nationalization. Respective competent authority at different level shall establish relevant legal rules for such purpose”.
Reviews on Taiwan Constitutional Court's Judgment no. 13 of 2022Reviews on Taiwan Constitutional Court's Judgment no. 13 of 2022 2022/11/24 I.Introduction In 2012, the Taiwan Human Rights Promotion Association and other civil groups believe that the National Health Insurance Administration released the national health insurance database and other health insurance data for scholars to do research without consent, which may be unconstitutional and petitioned for constitutional interpretation. Taiwan Human Rights Promotion Association believes that the state collects, processes, and utilizes personal data on a large scale with the "Personal Data Protection Law", but does not set up another law of conduct to control the exercise of state power, which has violated the principle of legal retention; the data is provided to third-party academic research for use, and the parties involved later Excessive restrictions on the right to withdraw go against the principle of proportionality. The claimant criticized that depriving citizens of their prior consent and post-control rights to medical data is like forcing all citizens to unconditionally contribute data for use outside the purpose before they can use health insurance. The personal data law was originally established to "avoid the infringement of personality rights and promote the rational use of data", but in the insufficient and outdated design of the regulations, it cannot protect the privacy of citizens' information from infringement, and it is easy to open the door to the use of data for other purposes. In addition, even if the health insurance data is de-identified, it is still "individual data" that can distinguish individuals, not "overall data." Health insurance data can be connected with other data of the Ministry of Health and Welfare, such as: physical and mental disability files, sexual assault notification files, etc., and you can also apply for bringing in external data or connecting with other agency data. Although Taiwan prohibits the export of original data, the risk of re-identification may also increase as the number of sources and types of data concatenated increases, as well as unspecified research purposes. The constitutional court of Taiwan has made its judgment on the constitutionality of the personal data usage of National Health Insurance research database. The judgment, released on August 12, 2022, states that Article 6 of Personal Data Protection Act(PDPA), which asks“data pertaining to a natural person's medical records, healthcare, genetics, sex life, physical examination and criminal records shall not be collected, processed or used unless where it is necessary for statistics gathering or academic research by a government agency or an academic institution for the purpose of healthcare, public health, or crime prevention, provided that such data, as processed by the data provider or as disclosed by the data collector, may not lead to the identification of a specific data subject”does not violate Intelligible principle and Principle of proportionality. Therefore, PDPA does not invade people’s right to privacy and remains constitutional. However, the judgment finds the absence of independent supervisory authority responsible for ensuring Taiwan institutions and bodies comply with data protection law, can be unconstitutional, putting personal data protection system on the borderline to failure. Accordingly, laws and regulations must be amended to protect people’s information privacy guaranteed by Article 22 of Constitution of the Republic of China (Taiwan). In addition, the judgment also states it is unconstitutional that Articles 79 and 80 of National Health Insurance Law and other relevant laws lack clear provisions in terms of store, process, external transmission of Personal health insurance data held by Central Health Insurance Administration of the Ministry of Health and Welfare. Finally, the Central Health Insurance Administration of the Ministry of Health and Welfare provides public agencies or academic research institutions with personal health insurance data for use outside the original purpose of collection. According to the overall observation of the relevant regulations, there is no relevant provision that the parties can request to “opt-out”; within this scope, it violates the intention of Article 22 of the Constitution to protect people's right to information privacy. II.Independent supervisory authority According to Article 3 of Central Regulations and Standards Act, government agencies can be divided into independent agencies that can independently exercise their powers and operate autonomously, and non- independent agencies that must obey orders from their superiors. In Taiwan, the so-called "dedicated agency"(專責機關) does not fall into any type of agency defined by the Central Regulations and Standards Act. Dedicated agency should be interpreted as an agency that is responsible for a specific business and here is no other agency to share the business. The European Union requires member states to set up independent regulatory agencies (refer to Articles 51 and 52 of General Data Protection Regulation (GDPR)). In General Data Protection Regulation and the adequacy reference guidelines, the specific requirements for personal data supervisory agencies are as follows: the country concerned should have one or more independent supervisory agencies; they should perform their duties completely independently and cannot seek or accept instructions; the supervisory agencies should have necessary and practicable powers, including the power of investigation; it should be considered whether its staff and budget can effectively assist its implementation. Therefore, in order to pass the EU's adequacy certification and implement the protection of people's privacy and information autonomy, major countries have set up independent supervisory agencies for personal data protection based on the GDPR standards. According to this research, most countries have 5 to 10 commissioners that independently exercise their powers to supervise data exchange and personal data protection. In order to implement the powers and avoid unnecessary conflicts of interests among personnel, most of the commissioners are full-time professionals. Article 3 of Basic Code Governing Central Administrative Agencies Organizations defines independent agency as "A commission-type collegial organization that exercises its powers and functions independently without the supervision of other agencies, and operates autonomously unless otherwise stipulated." It is similar to Japan, South Korea, and the United States. III.Right to Opt-out The judgment pointed out that the parties still have the right to control afterwards the personal information that is allowed to be collected, processed and used without the consent of the parties or that meets certain requirements. Although Article 11 of PDPA provides for certain parties to exercise the right to control afterwards, it does not cover all situations in which personal data is used, such as: legally collecting, processing or using correct personal data, and its specific purpose has not disappeared, In the event that the time limit has not yet expired, so the information autonomy of the party cannot be fully protected, the subject, cause, procedure, effect, etc. of the request for suspension of use should be clearly stipulated in the revised law, and exceptions are not allowed. The United Kingdom is of great reference. In 2017, after the British Information Commissioner's Office (ICO) determined that the data sharing agreement between Google's artificial intelligence DeepMind and the British National Health Service (NHS) violated the British data protection law, the British Department of Health and Social Care proposed National data opt-out Directive in May, 2018. British health and social care-related institutions may refer to the National Data Opt-out Operational Policy Guidance Document published by the National Health Service in October to plan the mechanism for exercising patient's opt-out right. The guidance document mainly explains the overall policy on the exercise of the right to opt-out, as well as the specific implementation of suggested practices, such as opt-out response measures, methods of exercising the opt-out right, etc. National Data Opt-out Operational Policy Guidance Document also includes exceptions and restrictions on the right to opt-out. The Document stipulates that exceptions may limit the right to Opt-out, including: the sharing of patient data, if it is based on the consent of the parties (consent), the prevention and control of infectious diseases (communicable disease and risks to public health), major public interests (overriding) Public interest), statutory obligations, or cooperation with judicial investigations (information required by law or court order), health and social care-related institutions may exceptionally restrict the exercise of the patient's right to withdraw. What needs to be distinguished from the situation in Taiwan is that when the UK first collected public information and entered it into the NHS database, there was already a law authorizing the NHS to search and use personal information of the public. The right to choose to enter or not for the first time; and after their personal data has entered the NHS database, the law gives the public the right to opt-out. Therefore, the UK has given the public two opportunities to choose through the enactment of special laws to protect public's right to information autonomy. At present, the secondary use of data in the health insurance database does not have a complete legal basis in Taiwan. At the beginning, the data was automatically sent in without asking for everyone’s consent, and there was no way to withdraw when it was used for other purposes, therefore it was s unconstitutional. Hence, in addition to thinking about what kind of provisions to add to the PDPA as a condition for "exception and non-request for cessation of use", whether to formulate a special law on secondary use is also worthy of consideration by the Taiwan government. IV.De-identification According to the relevant regulations of PDPA, there is no definition of "de-identification", resulting in a conceptual gap in the connotation. In other words, what angle or standard should be used to judge that the processed data has reached the point where it is impossible to identify a specific person. In judicial practice, it has been pointed out that for "data recipients", if the data has been de-identified, the data will no longer be regulated by PDPA due to the loss of personal attributes, and it is even further believed that de-identification is not necessary. However, the Judgment No. 13 of Constitutional Court, pointed out that through de-identification measures, ordinary people cannot identify a specific party without using additional information, which can be regarded as personal data of de-identification data. Therefore, the judge did not give an objective standard for de-identification, but believed that the purpose of data utilization and the risk of re-identification should be measured on a case-by-case basis, and a strict review of the constitutional principle of proportionality should be carried out. So far, it should be considered that the interpretation of the de-identification standard has been roughly finalized. V.Conclusions The judge first explained that if personal information is processed, the type and nature of the data can still be objectively restored to indirectly identify the parties, no matter how simple or difficult the restoration process is, if the data is restored in a specific way, the parties can still be identified. personal information. Therefore, the independent control rights of the parties to such data are still protected by Article 22 of the Constitution. Conversely, when the processed data objectively has no possibility to restore the identification of individuals, it loses the essence of personal data, and the parties concerned are no longer protected by Article 22 of the Constitution. Based on this, the judge declared that according to Article 6, Item 1, Proviso, Clause 4 of the PDPA, the health insurance database has been processed so that the specific party cannot be identified, and it is used by public agencies or academic research institutions for medical and health purposes. Doing necessary statistical or academic research complies with the principles of legal clarity and proportionality, and does not violate the Constitution. However, the judge believes that the current personal data law or other relevant regulations still lack an independent supervision mechanism for personal data protection, and the protection of personal information privacy is insufficient. In addition, important matters such as personal health insurance data can be stored, processed, and transmitted externally by the National Health Insurance Administration in a database; the subject, purpose, requirements, scope, and method of providing external use; and organizational and procedural supervision and protection mechanisms, etc. Articles 79 and 80 of the Health Insurance Law and other relevant laws lack clear provisions, so they are determined to be unconstitutional. In the end, the judge found that the relevant laws and regulations lacked the provisions that the parties can request to stop using the data, whether it is the right of the parties to request to stop, or the procedures to be followed to stop the use, there is no relevant clear text, obviously the protection of information privacy is insufficient. Therefore, regarding unconstitutional issues, the Constitutional Court ordered the relevant agencies to amend the Health Insurance Law and related laws within 3 years, or formulate specific laws.